Commercial Hot water Installation

Our Client requires a Hot water installation for a Gymnasium to satisfy High demand.
The gymnasium is currently being renovated in Sutton in Ashfield

The installation features:

Vaillant 46kw Commercial Boiler

1000L Hot water storage by means of external Buffer tank, with Secondary return and Full safety controls

Steam generation for Steam Room

 

Write a Comment

Your email address will not be published. Required fields are marked *

2 × three =